10 Marla House Construction Cost in DHA Lahore – Grey Structure vs Turnkey (2025 Guide)

WhatsApp Channel Join Now

Are you planning to build a 10 Marla house in DHA Lahore in 2025? One of the most common questions asked by homeowners is: What will it cost me? Whether you’re going for a grey structure or a full turnkey solution, understanding the breakdown of costs can help you plan better and avoid unexpected surprises.

In this guide, we’ll give you a detailed, real-world estimate for both grey structure and turnkey construction costs in DHA Lahore by one of the best construction companies in DHA Lahore based on market rates and practices in 2025.

What is a Grey Structure?

A grey structure includes the core construction elements:

  • Foundation and structure
  • Walls and roofing
  • Cement plaster
  • Electrical piping
  • Plumbing piping

It does not include finishes like tiles, paint, kitchen/bath fittings, woodwork, or false ceilings.

What is a Turnkey Solution?

A turnkey house is fully finished and ready to move in. It includes:

  • Grey structure + finishing
  • Flooring, ceilings, paint
  • Electrical fixtures and switches
  • Kitchen and bathroom installations
  • Doors, windows, wardrobes, etc.

You get the keys – and it’s ready to live in.

Construction Cost in DHA Lahore (2025) – 10 Marla House

CategoryEstimated Cost (PKR/sq ft)Total Cost (Approx.)
Grey Structure3,500 to 3,800PKR 4.5M to 5M
Turnkey House5,800 to 6,200PKR 7.5M to 8.5M

Based on a typical 10 Marla covered area of 3,000 sq ft.

Breakdown of Grey Structure Cost (2025)

ItemApprox. Cost (PKR)
Excavation + Foundation500,000
Structure (Bricks, RCC)1,600,000
Cement, Sand, Crush1,000,000
Plumbing & Electrical300,000
Misc. (Scaffolding, Labor)700,000
Total4.5M to 5M

Breakdown of Turnkey Cost (2025)

ItemApprox. Cost (PKR)
Grey Structure4.5M
Flooring & Tiles900,000
Paint & False Ceiling700,000
Doors & Windows600,000
Kitchen & Bathroom Fixtures500,000
Electrical & Light Fixtures400,000
Wardrobes, Cabinets500,000
Total7.5M to 8.5M

Factors That Can Affect Cost

  • Material prices: Fluctuations in cement, steel, tiles, etc.
  • Contractor quality: Experienced builders may charge more but deliver better.
  • Design & layout: Complex designs cost more in labor and materials.
  • Location within DHA: Some phases have specific bylaws and material requirements.

Which One Should You Choose?

Choose Grey Structure if:

  • You want to manage finishing yourself.
  • You want to control budget step by step.
  • You have trusted suppliers or interior designers.

Choose Turnkey if:

  • You need peace of mind.
  • You want timely delivery without hassle.
  • You lack time or experience to manage labor.

Final Thoughts

DHA Lahore remains one of the most prestigious and planned societies to build your dream home. Whether you choose grey structure or turnkey construction, always hire a reputable construction company near me with DHA compliance and experience.

Want a custom cost estimate? Or want to book a site visit?

Contact Glorious Builders

🏢 Glorious Builders – DHA Lahore Home Construction Experts
📞 Call/WhatsApp: +92-323-9999450
🌐 Visit: gloriousbuilders.com

Similar Posts